Why Prime InspectionsExperience + Equipment + Productivity = fewer delays, lower risk, and a partner that scales with you.
Experience
3,400+ pipeline miles inspected for North American operators and pipeline contractors.
Capacity
A fleet of AUT, RT, and RTR systems with qualified crews ready to support multiple spreads at once.
Productivity
Applying advanced weld inspection techniques as an extension of the operator’s quality program — improving throughput and execution across mainline, tie-ins, and mini-gang heavy-wall inspection.
Project Experience
Approximate miles inspected by pipe diameter — 3,400+ miles in total
Rounded estimates.
How it started → How it’s going

AUT systems ready to deploy
Fleet capacity to staff multiple spreads simultaneously — without waiting on equipment.
AUT at scale
Deep experience, documented results, and production you can plan around.
Automated ultrasonic testing85+ certified crews in house
Mainline AUT, repair units, tie-in PAUT and mini-gang crews running in parallel.
PAUT tie-ins proven
OmniScan X4, encoded scanners, corrosion mapping, TOFD and digital radiography (RTR).
Proven crew model
4-man mainline + 2-man repair crews delivering 100–150 welds/day on mainline.
Mobilize fast
24/7 response from our Katy and Lubbock offices and field locations positioned nationwide.
Three Chains of Thought on Who Hires NDT
Three models exist for who holds the NDT contract on pipeline construction — and Prime Inspections works under all three. Follow the money in each: it shows where the potential for conflict of interest lives.
1. Direct Owner/Operator Hire Recommended
Owner/Operator → hires & pays → NDT Provider — no $ ties — Contractor welds
- Accept/repair calls insulated from pressure by the company whose welds are being judged
- Digital weld records flow directly into the Owner/Operator’s integrity program and PHMSA traceability
- Owner/Operator carries contract administration and coordination
- Inspection appears as an owner line item rather than inside the contractor’s bid
2. EPC Hire
Owner/Operator → contracts → EPC — hires & pays — NDT Provider
- Single point of contracting; NDT integrated into the EPC schedule; less owner admin
- EPCs are measured on milestones and budget, so inspection findings that trigger rework work against both
- Findings reach the Owner/Operator through the EPC rather than directly
- Where production pressure sits with the party holding the inspection contract, acceptance decisions are harder to insulate
3. Contractor Hire — Owner/Op Level III Audits the Sub
Contractor → hires & pays → NDT Sub — sampled audits, after the fact — Owner/Op Lvl III
- Lowest apparent cost; NDT crew moves in lockstep with welding; audit adds a partial check
- The inspection contract sits with the party whose welds are being judged — a structural pressure the contract does not remove
- Audits sample after the fact — systemic issues surface after joints are coated, lowered in, and buried
- Audit findings trigger disputes and rework instead of preventing them
Nationwide Reach
Industries & Solutions
- AUT
- PAUT
- TOFD
- UT
- RT
- RTR
- DR/CR
- MT
- PT
- PMI
Markets
- Midstream
- Compressor
- Power Gen
- LNG
- Data Center
- Integrity
Related resources
Need a Bid?
We bid the job the way we’d do the work — focused on helping. Contact us to discuss your project.